Repair of a concrete floor

A new coating will be applied to the concrete floors in the supermarket's warehouse. These floors will also have to bear the load of forklifts. At the examination
on the substrate, a layer of scale was found. Please list the coating steps one by one

Activities related to the implementation of the coating on the concrete floor consist of:

1) removal of the scale layer by rubbing with blast furnace slag, then thoroughly cleaned;

2) priming the substrate with a colorless epoxy resin, diluted depending on the absorbency of the substrate;

3) applying a layer of solvent-free epoxy varnish;

4) applying a top layer of solvent-free epoxy varnish.

Naturally, also in this case, after priming the substrate with epoxy resins, subsequent layers can be made of solvent-free polyurethane varnishes.